High beam current operation of a PETtrace™ cyclotron for 18F- production

Appl Radiat Isot. 2012 Jun;70(6):922-30. doi: 10.1016/j.apradiso.2012.03.007. Epub 2012 Mar 18.

Abstract

Upgrades and optimisation achieved 160 μA total target current operation of a GE PETtrace cyclotron in dual target mode for the routine production of [(18)F]FDG for >2 years. Approximately 900 GBq of (18)F(-) and >500 GBq of [(18)F]FDG can be produced routinely in a single production run, meeting the routine [(18)F]FDG requirements with our customer base and achieving economies of scale. Production of >1 TBq of (18)F(-) in a single run was achieved. Reliability, saturation and synthesis yields were not adversely affected.

MeSH terms

  • Cyclotrons*
  • Equipment Design
  • Equipment Failure Analysis
  • Fluorodeoxyglucose F18 / chemical synthesis*
  • Fluorodeoxyglucose F18 / radiation effects
  • Isotope Labeling / instrumentation*
  • Materials Testing
  • Positron-Emission Tomography / instrumentation*
  • Radiation Dosage
  • Radiopharmaceuticals / chemical synthesis*

Substances

  • Radiopharmaceuticals
  • Fluorodeoxyglucose F18